Picture this: the concrete placement point is 25 metres away, but a building stands between the pump and the slab. Or you need to work beneath a low canopy, with very little overhead clearance above the truck. In situations like these, the boom is theoretically long enough, yet the end hose cannot reach the required position, or there is simply no room to unfold the boom. This is where the number of boom sections becomes a key factor in jobsite productivity.
CIFA News
Read CIFA news covering products, technology, events and company projects, with updates on innovation, people and developments in the concrete industry.
Search by category
-
-
Each excavation advance leaves a stretch of rock or ground unsupported. Whether excavation uses blasting or mechanical methods, this exposed ground needs to be secured quickly. The longer it remains unsupported, the more the ground relaxes and deforms, increasing the risk of exceeding design limits or allowing blocks to fall.
-
News
13/11/2026
CIFA MK32L truck mixer pump: field experience with a compact, simple, high-performance machine
On a jobsite, space is often the first constraint. Positioning and stabilising a heavy vehicle in a tight area takes time and care, and it shapes the whole working day.
That is why CIFA designs its concrete pumps around the daily needs of the people who drive and operate them. These operators know their machine is both a valuable working tool and an investment in the future. -
After every concrete delivery, the chute, the tyres, the hopper and, from time to time, the inside of the drum stay in contact with cement, aggregates, water and any admixtures. If these materials are not dealt with, they form deposits. Once hardened, those deposits take far more time and money to remove than fresh residues.
-
An unplanned pump downtime is never just a technical problem: it is a planning problem. Knowing which spare parts to keep in stock, and why, makes the difference between a repair that takes a few hours and a jobsite that stands idle for days.
-
Truck-mounted concrete pumps require control systems that can increase safety, precision, and productivity without making the operator’s job more complicated.
-
In the construction industry, the choice of concrete pumping system depends on the machine’s production capacity and operational variables such as job site logistics, accessibility of the work area, pumping distance, and operational continuity.
-
News
23/09/2026
Truck-Mounted Concrete Pumps: What They Are, When to Use Them, Configurations, and Dimensions
Truck-mounted concrete pumps are among the most widely used pieces of equipment for pumping and distributing concrete on jobsites.
-
On-site, concrete pumps and truck mixer pumps directly affect logistics, pouring times, operational continuity, and total cost of ownership.
-
On June 24th, 2026, CIFA welcomed representatives from main leading construction equipment European companies and industry associations to its headquarters in Senago (Milan, Italy) for the annual meeting of the CECE Construction Equipment Product Group, the working group dedicated to equipment for concrete production, transport, and pumping.
Our Guides
23/09/2026
Concrete Pumps and Truck Mixer Pumps: The Complete Guide
On-site, concrete pumps and truck mixer pumps directly affect logistics, pouring times, operational continuity, and total cost of ownership.